INHABIT LAB ENG
  • HOME
  • PROJECTS
  • ABOUT US
  • PASSIVHAUS
  • CONTACT

Vertical Divider
38 HIGH STREET
​Retrofit of Grade II listed building
​Location:           Huntingdon (UK)
Project Value:   Undisclosed 
Size:                    250 m2      
Client:                 RBP
Year:                    2022

Contractor:        Redwood 
Photographs:     Daniel Burston                ​​​
Full retrofit of a Grade II listed building, formerly used as a commercial premises with a single residential unit into three energy efficient apartments and one smaller ground floor commercial unit that connects with the high street.  The single floor rear volume of the existing building. which was built in the 1960s has been fully upgraded and given a new identity, which contrasts elegantly with the existing brickwork of the Garde II listed building. 

Menu

Home
Projects
About
​Passivhaus
Contact

Services

Passivhaus design
Energy efficiency consultancy
Sustainable architecture
​Circular Design
Biomaterials +​Healthy buildings

Support

​Contact
Privacy policy
Subscribe
FAQ
Terms of Use
© COPYRIGHT 2015. ALL RIGHTS RESERVED.
Vertical Divider

Barcelona Office

C/Leiva, 47 (Local)
08014 (Barcelona)
Spain
​(+34) 655 868 121
[email protected]

UK Office

Leabrink
Fownhope
HR1 4PJ
​(+34) 655 868 121
[email protected]
Picture
  • HOME
  • PROJECTS
  • ABOUT US
  • PASSIVHAUS
  • CONTACT